Del Oro is proudly celebrating 50 years of serving California

Search

For 24-hour customer support or emergency, please call:

1-877-DEL-ORO-H2O
(1-877-335-6764)

For Billing or Service Inquiries:
1-530-717-2500

Camp Fire Affected Districts - Sampling Results


The following Excel files show results of sampling at noted locations.

Descriptions:
48-Hour Soak – Collected at services of burnouts with 48-hour soak time
(Answers the question: Are the service lines associated with burnouts contaminated?)
Samples are noted as Phase I (sampling done by the state on 3/11/2019) or Reconnect (samples taken before reconnection is allowed).
Phase One Post-Flush – Collected at services of burnouts after 2 minute flush
(Answers the question: Are the main lines located in burnout areas contaminated?)
Samples are all Phase I (sampling done by the state on 3/11/2019, same properties as 48-Hour Soak for that date).
Occupied Homes – Collected at certain occupied homes in areas of burnouts 
(Answers the question: Is there on-going contamination present at a representative sample of occupied homes?)
Samples are noted as Phase I (sampling done by the state on 3/11/2019), Customer Request (samples taken at customer's request), or Phase II (samples taken as part of Phase II random testing plan).
Occupied RVs- Collected at the riser providing water to occupied RVs on burned lots
(Answers the question: Is there on-going contamination present at any occupied and connected RVs located at burnouts?)
Samples are noted as Phase I (sampling done by the state on 3/11/2019) or Customer Request (samples taken at customer's request).
 
The worksheets will be updated with sample results as soon as Del Oro receives them.
 

Sampling Results Files

Sample 48-Hour Soak

Updated on 12 September 2019

  • 48-Hour Soak Sampling

Sample Phase One Post Flush

Updated on 22 August 2019

  • Phase One Post-Flush Sampling

Sample Occupied Homes

Updated on 27 August 2019

  • Occupied Home Sampling

Sample Occupied RVs

Updated on 22 August 2019

  • Occupied RV Sampling

Benzene Results Posted 2/20/2019

Updated on 22 March 2019

  • Benzene Results Through 1/31/2019

Lime Saddle Sampling January 2019

Updated on 22 March 2019

  • Lime Saddle Raw and Treated Lab Results January 2019
Copyright © 2016 Del Oro Water Company. All rights reserved.